Merge together: The line target jumps often from time lags
· ADAS Imaging Board
The large time difference between the front and side views causes the lane-changing target to jump. Unify triggers or timestamps, and discard misaligned frames.。
Background and objectives
Freely run cameras magnify errors when they are in Merge together. Hardware batches, drive, ISP/tagged packages, and changes in platform configurations at any end, run a sample. No copy of the logs, do not enter the client site. Leave at least one set of matches to daytime, empty, dry and wet, and avoid signing only on ideal items.「Multi-Camera Time Alignment」It is more reliable to write it as a checklist: preconditions, operating procedures, acceptance criteria, and the location where evidence is stored. Following the checklist for after-sales service is less cumbersome than repeated verbal training. When performing on-site verification, record the device number, software package number, and the illuminance or vehicle speed/pedestrian flow at the time, and capture a video segment of no less than 8 seconds.。
Key Points for Implementation
The list of the checkers, dates, versions and templates/Video paths is available; the number can be playedback, and the number can be matched, before the work can be signed off.「Multi-Camera Time Alignment」Related closed loop; after the pilot is approved, it will be expanded to all locations or the entire fleet. Most rework cases are not due to algorithms suddenly deteriorating overnight, but rather because bracket tolerances, module batches, or configurations were rolled back without anyone taking note. When encountering「Multi-Camera Time Alignment」For related complaints, first reproduce the issue following the same path, then adjust the parameters. If the conditions change, follow「Multi-Camera Time Alignment」The original path is re-measured, and the new and old results are saved side by side for easy reconciliation in the future.。
Acceptance Recommendations
The transaction is written to the Merge configuration. The division of labour is clear at the time of handover: the integrated manufacturer is responsible for installing the Joint Investment, and the ADAS image provides a baseline package and a qualified decision. The terminology is uniform, avoiding each side speaking. Sampling insulation is determined by one for every eight Sampling insulations, and no less than 18% for each batch.Guy, do it on site.「Multi-Camera Time Alignment」When you write about the phenomenon, you can write it: under what light/speed/flow items, how long will it last, the photograph or video of Video. The ADAS image project says it's easy to get off the shift. The probative Conform evidence is open, the version numbers are right, and no oral conclusions are left. It is recommended that the receiving material be set together: the sample or short Video, the current parameters or the placard number, the checker's signature, the date. The missing item does not count as the end of the acceptance.。False Positive、The case of Failed is also filed for leaks, color deviations, broken streams, etc., press「Multi-Camera Time Alignment」CategoryAnd then you can re-check the next item. A comparison before the volume or the bail: the same route, the same scene, the old version, and the same one. The badness stops, and does not release it on the basis of "senses of similarity." When the same problem arises again, you can transfer it out of the last one.「Multi-Camera Time Alignment」as a reference, and then decide whether to change the parameters。
Need assistance in selecting?
Description of scene and interface, RUNZT Technology to help match the platform。